GreeceANNOUNCED
White Dragon — Kozani Hydrogen Cluster
EUR 8.06bn
White Dragon is a proposal by a Greek consortium of 10 companies led by DEPA, submitted on 13 May 2021 for Important Project of Common European Interest (IPCEI) status for hydrogen. According to DEPA's announcement, the proposal is worth EUR 8.063 billion, with planned output of about 250,000 tonnes of green hydrogen per year and implementation in 2022–2029 in Western Macedonia, replacing lignite power plants. Earlier figures of 5,000 MW capacity and 283,000 tonnes of output are not confirmed by the source and have been removed. The announcement dates from 2021; the project's current status has not been confirmed.
Power · Industry · PEM · Alkaline · SOEC · Fuel cells
European UnionUNDER CONSTRUCTION
North Adriatic Hydrogen Valley (NAHV)
EUR 344.4m
The North Adriatic Hydrogen Valley (NAHV) is a cross-border project of Slovenia, Croatia and Italy's Friuli Venezia Giulia region, funded through the Clean Hydrogen Partnership. According to the partnership's page, the total budget is EUR 344,426,920 and the EU contribution EUR 24,999,996. The project runs from 1 September 2023 to 31 August 2029 and foresees 18 testbeds in industry, energy and transport, with output of more than 5,000 tonnes of renewable hydrogen per year. The Clean Hydrogen Partnership lists 34 partners, while META Group cites 37; the consortium size should be checked at review.
Power · Transport · Industry · PEM · Fuel cells
RomaniaUNDER CONSTRUCTION
SAPE HY 10 Hydrogen Energy Storage
3 MW
SAPE HY 10 is a green-hydrogen energy storage project in Dârvari, Prahova county, Romania. According to law firm CMS's guide (November 2024), the project includes a 3 MW PEM electrolyser and annual output of about 425 tonnes of hydrogen. The total value is RON 54.63 million, of which RON 29.95 million comes from the National Recovery and Resilience Plan (PNRR). Completion was expected at the end of 2025; whether the plant has been completed has not been confirmed. A euro amount is not given in the source and has been removed.
Power · PEM · Storage
BulgariaPLANNED
ZAHYR Hydrogen Valley Stara Zagora
EUR 24.6m
ZAHYR is a hydrogen valley in Bulgaria's Stara Zagora region, funded through the Clean Hydrogen Partnership. According to the partnership's page, the total project value is EUR 24,591,615 and the EU contribution EUR 7,999,786; the project runs from 1 January 2024 to 31 October 2030. The coordinator is Tertius Advisory. It foresees an electrolyser producing 150 kg of hydrogen per day and an ammonia cracker. Earlier figures of two electrolysers totalling 5 MW and a 20 MW solar plant are not confirmed by the source and have been removed.
Power · Transport · PEM
RomaniaUNDER CONSTRUCTION
OMV Petrom Petrobrazi 35 MW Green Hydrogen
35 MW
Second electrolyser, of 35 MW, at OMV Petrom's Petrobrazi refinery in Romania. On 28 August 2026 OMV Petrom announced the electrolyser had been delivered, raising green hydrogen capacity at the refinery to 55 MW. Together with the 20 MW unit, the project is financed from Romania's National Recovery and Resilience Plan: the two projects are worth about EUR 140 million, with up to EUR 50 million in grants.
Industry · PEM
European UnionPLANNED
SoutH2 Corridor 3,300 km Hydrogen Pipeline
The SoutH2 Corridor is a planned hydrogen pipeline of about 3,300 km from North Africa through Italy and Austria to Germany. According to the operators' consortium, about 65% of the route is repurposed existing gas infrastructure, and the import potential is 4 million tonnes of green hydrogen per year, with operation starting in the early 2030s. The corridor was included in the 6th list of Projects of Common Interest (PCI) in November 2023, and according to a consortium announcement of 1 December 2025 it is again on the PCI list. An earlier claim of 4 billion Nm3 by 2030 is not confirmed and has been removed; the completion date has been left blank.
Transport · Pipelines
SwedenUNDER CONSTRUCTION
Stegra Boden Green Steel Plant
740 MW
Stegra (formerly H2 Green Steel) is building a steel plant in Boden in northern Sweden based on hydrogen from electrolysis, with 740 MW of electrolysis. The original plan foresaw production in 2024; according to the latest information, the start of production has moved to early 2027, with the timeline under review. The company completed a EUR 1.4 billion round in June 2026 and, according to Bloomberg, in November 2026 is seeking at least two billion dollars more; Stegra has not confirmed that amount.
Industry · Dri
RomaniaUNDER CONSTRUCTION
OMV Petrom Petrobrazi 20 MW Green Hydrogen
20 MW
20 MW electrolyser at OMV Petrom's Petrobrazi refinery in Romania, the first of two projects for which the company signed financing from Romania's National Recovery and Resilience Plan in February 2024. The two projects, of 20 and 35 MW, are worth about EUR 140 million, with up to EUR 50 million in grants. The first module of the 20 MW electrolyser was delivered in 2026.
Industry · PEM
GermanyUNDER CONSTRUCTION
EWE Emden 320 MW Electrolyser
320 MW
EWE's 320 MW electrolysis project in Emden, Lower Saxony. According to EWE, the plant is scheduled to start producing green hydrogen, primarily for industrial customers, from late 2028.
Power · PEM
HungaryOPERATIONAL
MOL Százhalombatta 10 MW Green Hydrogen Plant
10 MW · EUR 22m
10 MW green hydrogen plant at MOL's Danube Refinery in Százhalombatta, Hungary, with an electrolysis unit from Plug Power. The plant was handed over in April 2024, and MOL announced the start of production in September 2024. Annual capacity is 1,600 tonnes of green hydrogen, cutting emissions by 25,000 tonnes of CO2 a year. The investment is EUR 22 million.
Industry · PEM
CroatiaUNDER CONSTRUCTION
INA Rijeka 10 MW Green Hydrogen Plant
10 MW · EUR 61m
Green hydrogen plant with a 10 MW electrolyser at INA's Rijeka refinery, to be powered by an 11 MW solar plant. In December 2025 INA contracted the hydrogen production and distribution plant with Končar and Siemens Energy (EUR 22.5 million excluding VAT) and the solar plant with Končar. Work on the solar plant was completed in July 2026, electrolyser installation is due to finish by the end of 2026, and first hydrogen is planned for 2027. Capacity is about 1,500 tonnes a year, total investment about EUR 61 million, and the EU contribution from the Recovery and Resilience Facility EUR 15 million.
Industry · PEM