According to Balkan Green Energy News (11 January 2024), North Macedonia plans a 250–300 MW gas-fired power plant at the Bitola thermal power plant site, designed to run on natural gas with a later switch to hydrogen, and is seeking a strategic investor for it together with the Negotino plant. The capacity in the database (275 MW) is the midpoint of that range. An investment estimate and construction timeline are not in the source and have been removed; status changed from planned to announced. The status after January 2024 has not been confirmed.
CAPACITY
275 MW
MATURITY
Concept
PROJECT DATA
- Geography
- Western Balkans
- Segments
- Power
- Technical setup
- CCGT 250–300 MW (gas/H2 ready)
- Funding
- Investitor u potrazi; ESM AD