An electrolyser splits water into hydrogen and oxygen using electricity. It is the heart of every green hydrogen project and a decision taken early and corrected with difficulty: the choice of technology determines electricity consumption, how the plant runs alongside wind and solar, its lifetime and the cost of a kilogram of hydrogen. This guide explains the three technologies on the market today, how they really differ, and the questions an investor should put to a supplier.

The basic arithmetic

A kilogram of hydrogen holds 33.3 kilowatt-hours of energy, measured at lower heating value. No electrolyser runs without losses, so actual consumption depends on efficiency. The International Energy Agency assumes 60 per cent efficiency in its calculations, which corresponds to about 55 kilowatt-hours per kilogram. On top of that come about nine litres of purified water per kilogram of hydrogen by the chemical equation, and more in practice for water treatment and cooling.

From this follows the most important fact about the economics of electrolysis: electricity is the largest cost. A difference of a few percentage points in efficiency over twenty years of operation is worth more than a difference in the purchase price of the unit.

Alkaline electrolysis

The oldest and most widespread technology, in industrial use for more than a century. The electrodes sit in a liquid electrolyte, a potassium hydroxide solution, separated by a porous diaphragm. It operates at about 60 to 90 degrees Celsius.

  • Strengths. It uses nickel and steel instead of precious metals, so it is the cheapest per kilowatt. It has a long service life and the most references in large plants.
  • Limits. It responds more slowly to sudden changes in power and has a narrower operating range, so it is less suited to following wind and solar directly. It takes up more space. Newer pressurised models narrow these gaps.

PEM electrolysis

Instead of a liquid electrolyte it uses a solid polymer membrane that conducts protons. It operates at similar temperatures to alkaline, but at much higher current density.

  • Strengths. It changes output quickly, from near zero to full load, so it follows variable renewable generation well. It is compact and delivers high-purity hydrogen, often already under pressure.
  • Limits. The acidic environment requires iridium and platinum catalysts and titanium components. Iridium is among the rarest metals, so the price and availability of the raw material are a standing concern. It costs more per kilowatt than alkaline.

SOEC, solid oxide electrolysis

It operates at high temperatures, about 700 to 850 degrees Celsius, with a ceramic electrolyte, and splits steam instead of liquid water. Part of the energy required comes from heat, so its electricity consumption is the lowest of all the technologies.

  • Strengths. The highest electrical efficiency, particularly where waste heat or steam is available: at steelworks, refineries, fertiliser plants and alongside nuclear power stations. It can also run in reverse, as a fuel cell.
  • Limits. It is the youngest technology, with the fewest large references. The materials cope poorly with frequent heating and cooling, so it suits steady operation, not following wind and solar.

A fourth technology, AEM, tries to combine the cheap materials of alkaline electrolysis with the compactness of PEM. For now it is offered in small units and has no references in large plants.

The comparison at a glance

  • Maturity: alkaline is the most mature, PEM is commercial in large units, SOEC is in early commercial deployment.
  • Running on variable power: PEM best, alkaline adequate, SOEC weakest.
  • Electricity consumption: SOEC lowest where heat is available, alkaline and PEM similar.
  • Critical raw materials: PEM depends on iridium and platinum, alkaline on nickel, SOEC on ceramic materials and rare earths.
  • Cost per kilowatt: alkaline lowest, PEM higher, SOEC highest.

The price of the electrolyser is not the price of the plant

This is where early studies most often go wrong. According to a 2026 analysis by the International Energy Agency, total investment in an alkaline plant in 2025 was about 500 to 1,100 dollars per kilowatt in China and about 1,900 to 2,500 dollars outside China. Chinese manufacturers make the stack itself roughly 60 per cent more cheaply.

The same analysis shows, however, that more than half of total investment is not the stack but engineering, construction, balance-of-plant equipment and contingency, and those costs depend on where the plant is built. A Chinese stack installed in a European plant, with local equipment and local construction, lowers total investment by about eight per cent. The agency also notes that some Chinese electrolysers have faced efficiency and reliability problems, and lower efficiency directly raises the cost of a kilogram of hydrogen.

The lesson for an investor in the region: compare offers not on the price of the stack but on the total cost of hydrogen over the life of the plant, with guaranteed electricity consumption, guaranteed availability and the cost of stack replacement.

How much of this has actually been built

According to the International Energy Agency's Global Hydrogen Review 2026, installed electrolysis capacity worldwide doubled during 2025 to exceed four gigawatts. Nearly three quarters of new installations were in China. Low-emissions hydrogen production reached almost one million tonnes, and projects with a final investment decision are expected to deliver more than four million tonnes in 2030. That remains a small part of total world hydrogen consumption, which is met mostly from natural gas and coal.

How to choose

  • Stable supply and large capacity, for example alongside hydropower or under a power purchase agreement with an even profile: alkaline is usually the cheapest choice.
  • Direct connection to a wind or solar plant, limited space, or a need for pressurised hydrogen: PEM.
  • An industrial site with surplus heat or steam and steady operation: SOEC is worth considering, with the smaller number of references in mind.

European Union rules on renewable hydrogen also bear on the choice. Hourly matching of production with renewable electricity, which under the rules in force begins in 2030, rewards technologies that tolerate frequent changes in output. Our guide to the RFNBO rules covers this in detail.

Six questions for the supplier

  • What is the guaranteed electricity consumption per kilogram for the whole plant, not the stack alone, at the start and at the end of stack life?
  • How fast does efficiency degrade, and after how many operating hours is the stack replaced?
  • What is the minimum stable load, and how long does a cold start take?
  • What references does the supplier have in plants of similar size, and how long have they been running?
  • What exactly is in the scope of supply: water treatment, compression, gas purification, rectifiers, cooling?
  • Where do the critical raw materials come from, and who carries their price risk?