The European Union funds hydrogen through several instruments that are often confused although they serve different purposes: one pays per kilogram produced, another co-finances the investment, a third builds pipelines, a fourth funds research. Pick the wrong one and a year is lost. This guide sorts the instruments by purpose, shows what the calls so far have delivered, and answers the question asked most often in the region: which of them can a project outside the Union obtain.
The European Hydrogen Bank: a premium per kilogram
The Bank is not a bank in the usual sense but an auction mechanism funded from the Innovation Fund. A producer bids the premium per kilogram of renewable hydrogen it needs for the project to pay. The lowest bids win, and the premium is paid on volumes actually produced, for up to ten years. The minimum size is five megawatts of electrolysis at one site, and the project must be in the European Union or the European Economic Area.
The auctions so far:
- The first, pilot auction ran from November 2023 to February 2024 with a budget of 800 million euros. Six projects signed grant agreements in October 2024, worth 695 million euros in total.
- The second auction opened in December 2024 with 1.2 billion euros and a ceiling premium of four euros per kilogram. Of the 15 projects first selected, seven withdrew, and they accounted for about 83 per cent of the capacity awarded. The Commission invited projects from the reserve list, with markedly higher bids. Six projects signed agreements in January 2026, and only about 270 million euros was disbursed.
- The third auction opened in December 2025 with 1.3 billion euros. Results were published on 7 May 2026: 58 bids arrived from 11 countries, and nine projects were selected, totalling close to 1.1 gigawatts and about 1.09 billion euros of support.
- The fourth auction is announced for 3 December 2026, with a budget of up to 500 million euros. We track its terms and dates on the Funding page.
The second auction carries a lesson for every bidder: a low bid is not a win if the project cannot post the completion guarantee and meet its milestones. The Commission itself said the guarantee serves to weed out those who bid too low.
Alongside the auction runs the "auctions-as-a-service" model: a Member State uses its own money to fund projects on its territory that passed the European assessment but did not fit the budget. Germany, Spain and Austria have used it. Germany in this way put 1.3 billion euros behind projects in Denmark whose hydrogen German industry will buy.
The Innovation Fund: grants for investment
The fund is fed by emissions trading revenue and awards grants to projects that apply new low-carbon technologies at industrial scale, and to equipment manufacturing, including components for hydrogen production. The call opened in December 2025 had a budget of 2.9 billion euros. It drew 358 applications, and 77 projects were selected in October 2026. Applications are assessed on emission reduction, degree of innovation, project maturity, replicability and cost per tonne of emissions avoided. This instrument too is open only to projects in the Union and the European Economic Area.
CEF Energy: cross-border infrastructure
The Connecting Europe Facility funds studies and works on pipelines, storage, terminals and large electrolysers, but only for projects on the official list of Projects of Common Interest (PCI) and Projects of Mutual Interest (PMI). The 2026 call, with 600 million euros, was open from 30 April to 30 September. The previous call awarded about 650 million euros to 14 projects, eight of them hydrogen projects.
The PMI category matters for the region: these are projects linking the Union with third countries. The road to the money therefore starts not with an application but with getting the project onto the list, a process that takes years and runs through transmission system operators and the responsible ministries.
The Clean Hydrogen Partnership: research and hydrogen valleys
The Partnership operates under Horizon Europe and funds research, demonstration projects and hydrogen valleys, regional clusters in which production, distribution and use are developed together. The 2026 call had 105 million euros, of which 25 million for hydrogen valleys, and was open from 20 January to 15 April. Applicants are consortia of companies, institutes and universities from several countries.
IPCEI: state aid with Brussels' approval
Important Projects of Common European Interest are not a call to apply to. They are a framework in which Member States support large projects with their own money and the Commission approves that aid. The Hy2Infra wave, approved in February 2024, covers up to 6.9 billion euros of state aid from seven states for 33 projects. Participants are chosen by the states, so a company outside the Union can take part only indirectly, as a supplier or partner.
What is open to projects from Serbia and the region
The short answer: less than is usually assumed, but more than nothing.
- The European Hydrogen Bank and the Innovation Fund are not open. Production must be in the Union or the European Economic Area. The Bank's international leg, intended for partner countries, is still being designed by the Commission.
- Horizon Europe and the Clean Hydrogen Partnership are open. Serbia and the other Western Balkan countries are associated to the programme, so their companies, institutes and faculties can be full consortium members and receive funding. This is today the most realistic route to European money for hydrogen in the region.
- CEF is open indirectly, through Projects of Mutual Interest linking the region with the Union.
- Bilateral programmes of Member States. Germany, for example, runs a call for hydrogen projects outside the Union. We publish such calls on the Funding page.
- Development banks and pre-accession funds. The European Bank for Reconstruction and Development, the European Investment Bank and the Western Balkans Investment Framework finance the energy transition in the region, mostly through loans and technical assistance, not production premiums.
There is an indirect benefit as well. A buyer in the Union that must meet renewable hydrogen quotas can also buy from a producer outside the Union, if the hydrogen carries RFNBO certification. European money then arrives not as a subsidy but through the price. Our guide to the RFNBO rules explains the conditions.
What decides whether an application succeeds
- The buyer. A project without a signed or seriously negotiated offtake agreement struggles in the maturity assessment.
- The electricity. A renewable power purchase agreement and proof that the project meets the RFNBO rules.
- Permits and connection. Site status, permits and grid connection, with realistic dates.
- The financing structure. Proof of own contribution and the ability to post the completion guarantee.
- A realistic bid. The Bank's second auction showed the price of bidding too low: projects that won with premiums of 0.20 to 0.60 euros per kilogram withdrew, and the money went to costlier projects on the reserve list.
Sources
- European Hydrogen Observatory: European Hydrogen Bank
- S&P Global: most project capacity of the second auction withdraws, 18 September 2025
- European Commission: IF26 European Hydrogen Bank auction
- European Commission: Innovation Fund IF25 call
- CINEA: CEF Energy 2026 call, 30 April 2026
- Clean Hydrogen Partnership: 2026 call, 20 January 2026
- European Commission: IPCEI Hy2Infra approved, 15 February 2024
Figures checked on 27 November 2026. The terms of each call are established from its official documentation; this guide is for information and is not application advice.